The report indicates 6 uptime tests of palmsproject.net were performed over 1 254 days from July 31, 2021. Throughout all conducted assessments, palmsproject.net showcased functionality 3 times, with the most recent uptime on October 1, 2022, resulting in a code 200. 50.00% of the times palmsproject.net was evaluated resulted in it being unavailable, totaling 3 occurrences, most recently on December 31, 2024. The status of every response received has been confirmed error-free as of January 6, 2025. According to records, on December 31, 2024, palmsproject.net responded in — seconds, as opposed to an average of 0.646 seconds.